Open AccessPeer ReviewedPublished Monthly Since 2007 Vol. 19, Issue 12 · November 2026Media Kitinfo@guident.net
Open AccessCase ReportProsthodontics

Full Rehabilitation with Metal-Ceramic BR Idge Prostheses

  • Dr. Kuts Pavel Department of Prosthetic DentistryAssistant Professor

National Medical University, Ukraine

Guident · Volume 7, Issue 6 (May 2014)Published May 20142 min read15 figures

A 36-year-old patient turned to the clinic with the complaints of absence of teeth and impaired chewing function.

DIAGNOSIS

Root caries of 15, 23, 38, 48, 31, 32, 41 and 42 teeth. Adentia of 12, 14, 16, 22, 25, 36, 37, 46 and 47 teeth (Figs 1 and 2).

PLAN OF TREATMENT

Extraction of roots of 15, 23, 38, 48, 31, 32, 41 and 42 teeth with placement of Alpha Deny Implants in the area of 12, 14, 16, 22, 25, 36, 37, 46 and 47 teeth.

A temporary removable dental prosthesis was made at the stage of preparation for the operation (Fig 3).

Clinical figure

Fig 1. Initial clinical situation.

Course of operation: Removal of 15, 23, 31, 32, 38, 41, 42, 48 teeth and curettage of alveolar sockets were performed under infiltration anesthesia. The mucous membrane was cut along the alveolar crest

Clinical figure

Fig 2. Patient’s orthopantomogram at the stage of planning.

Clinical figure

Fig 3. Temporary removable dental prosthesis after extraction of teeth.

Clinical figure

Fig 4. Single-stage extraction of 15, 23, 31, 32, 38, 41, 42 and 48 roots of teeth.

Clinical figure

Fig 5.Control orthopantomogram after operation.

Clinical figure

Fig 6. Individual mandibular abutments.

Clinical figure

Fig 7. Individual maxillary abutments.

Clinical figure

Fig 8. Individual mandibular spoon

Clinical figure

Fig 9. Individual maxillary spoon.

in the area of 16, 14, 12, 22, 25, 36, 37, 46 and 47 teeth. Exfoliation of periosteal mucosal graft. Formation of bone bed. Placement of Alpha Dent Implants in the area of 12, 14, 16, 22, 25, 36, 37, 46 and 47 teeth (Photo 5). The implants are covered with screw-type plug. Suture of mucous membrane. Adjustment of temporary removable dental prosthesis. Administrations: antibiotic therapy, removal of stitches in seven days.

The doctors set to orthopedic part of treatment in six months.

Opening of implants and placement of the gingiva formers were followed by correction and insertion of immediate prosthesis being already available. The individual abutments were made (Photos 6 and 7). The imprints were taken with individual spoons (Photos 8 and 9). Then removable orthopedic construction was replaced by fixed one – temporary plastic bridge prosthesis was made (Photos 11, 12 and 13).

Clinical figure

Fig 10. Fixation of central occlusion with the wax rolls.

Clinical figure

Fig 11. Temporary plastic maxillary bridge.

Clinical figure

Fig 12. Temporary plastic mandibular bridge.

Clinical figure

Fig 13. Temporary plastic prostheses after placement of implants.This was done in order to eliminate gingival reduction around the implants as well as to determine the real height of bite, horizontal line of cutting edge, location of central incisormidline and their compliance with the implants.

Clinical figure

Fig 14. Metal-ceramic bridge prosthesis.

Clinical figure

Fig 15. Finished fixed orthopedic constructions in the oral cavity.

Then the metal-ceramic bridge prostheses were made (Fig 14).

Result: There was complete and total rehabilitation attained with insertion of maxillary and mandibular metal-ceramic bridge prostheses. The chewing and aesthetic functions were restored (Fig 15).

Disclaimer from Guident

The views and opinions expressed in articles published in Guident are solely those of the authors and do not necessarily reflect the views of the editors, the editorial board or the publisher, Ivory India. Guident does not endorse any product, technique or treatment described. Clinical content is intended for qualified dental and medical professionals and is not a substitute for individual clinical judgement. Guident, its editors and the publisher accept no liability for any consequence arising from the use of information published in the journal.

How to cite this article

Dr. Kuts Pavel Department of Prosthetic Dentistry. Full Rehabilitation with Metal-Ceramic BR Idge Prostheses. Guident. 2014 May;7(6). Available from: https://guident.net/articles/prosthodontics/full-rehabilitation-with-metal-ceramic-br-idge-prostheses.html

Related articles

More in Prosthodontics

All 444 articles
Vol. 7, Issue 6 · May 2014

Combating the Compromised Edentulism

The vibrant phase of Life - ‘Youth’, brings with it immense vitality, vigor and a consciousness about aesthetics. However, nothing in life is permanent. Time leaves its imprint on every…

Dr. Asha M. Rathod

Call for papers

Publish your clinical work in Guident

Original research, case reports and review articles are welcomed from clinicians and researchers worldwide. Every submission is assessed by the editorial board.